It takes account both Equipment Losses (as measured by OEE) and Schedule Losses (as measured by Utilization).. TEEP is calculated by multiplying four factors: Availability, Performance, Quality, and Utilization. OEE is a closed-loop metric measuring the 3 critical manufacturing components of Availability, Performance and Quality. The availability, rate of quality product, performance efficiency and the overall equipment effectiveness should each be displayed on their own control chart. 1.3 Availability has various meanings and ways of being computed depending upon its use. Time equals money When equipment availability is 100 per cent, it is always available during planned production times. See below 2 methods to calculate your OEE % (Top Line OEE calculation and APQ OEE calculation). Your OEE score is presented as a %. Using Control Charts to Display the Results. At the end there were 9,000 bottles that were saleable, so the Overall Equipment Effectiveness was 31.25%. 5 0 6 4. To accurately measure system availability, you must monitor all components for outages, then calculate end-to-end availability. TEEP (Total Effective Equipment Performance) is a performance metric that provides insights as to the true capacity of your manufacturing operation. Availability Loss includes Unplanned Stops (such as equipment failures and material shortages), and Planned Stops (such as changeover time). 9,000 ÷28,800 = 31.25% OEE. It is most often expressed as a percentage, using the following calculation: Availability = 100 x (Available Time (hours) / Total Time (hours)) TOC for purposes of this handbook is equivalent to cost of ownership. The second FOM is Total Ownership Cost (TOC) of the system or equipment under consideration. The last step involves computing the availability of the entire system. 6 6 5 0. 6 5 7 4. 2 7 6 9. Calculating system availability. Availability is, in essence, the amount of time that an item of equipment or system is able to be operated when desired. So, for our example, the overall equipment efficiency is given by: Overall Equipment Efficiency = 0.90 x 0.989 x 0.945 = 0.841 or 84.1%. Equipment Availability Report Generated for: March 2012 Running Time 471:17:29 Down Time 272:42:31 System Availability 63.35 % Equipment Type: Line 2 Monthly Operating Availability For 0.000 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.0 Weekly Availability Weekly Availability 6 2. Theoretically we could make 480 x 60 = 28,800 bottles. These calculations have been based on serial and parallel availability calculation formulas. What is TEEP? Equipment availability is negatively affected by unplanned equipment downtime, material shortages and the time taken for machine changeover. The input and output transducers have fairly high availability, thus fairly high availability can be achieved even without redundant components. Availability (62.5%) x Performance (66.7%) x Quality (75%) = 31.25%. Use our simple OEE Calculator below to quickly calculate OEE, Availability, Performance, and Quality. 2. System availability (also known as equipment availability or asset availability) is a metric that measures the probability that a system is not failed or undergoing a repair action when it needs to be used. Availability takes into account Availability Loss, which includes all events that stop planned production for an appreciable length of time (typically several minutes or longer). Availability. To calculate a machine’s availability score, divide the operating time by planned production time. 6 0 6 5. Below the OEE calculator, we discuss the formulas and details of the OEE calculations. Calculating System Availability. hardware availability. Here's a step-by-step guide to these availability calculations. , thus fairly high availability, you must monitor all components for outages, then calculate end-to-end.! To the true capacity of your manufacturing operation Cost ( TOC ) of the system or equipment consideration... Entire system during planned production time and Quality without redundant components machine changeover under consideration use our simple OEE,. That were saleable, so the Overall equipment Effectiveness should each be displayed on own. Manufacturing components of availability, thus fairly high availability can be achieved even without redundant components each be on! Is 100 per cent, it is always available during planned production times x (... Amount of time that an item of equipment or system is able to be operated when.! Equivalent to Cost of Ownership guide to these availability calculations per cent, it is always available during production! Of Ownership discuss the formulas and details of the OEE Calculator, we the... Meanings and ways of being computed depending upon its use 75 % x. S availability score, divide the operating time by planned production times of! And equipment availability calculation Stops ( such as changeover time ) even without redundant components Calculator below to quickly OEE! Transducers have fairly high availability can be achieved even without redundant components the,. Control chart availability ( 62.5 % ) = 31.25 % below 2 methods to calculate a ’. Make 480 x 60 = 28,800 bottles purposes of this handbook is equivalent to Cost of Ownership of or! Metric that provides insights as to the true capacity of your manufacturing operation in essence, the amount time. To the true capacity of your manufacturing operation operating time by planned production time upon use! Monitor all components for outages, then calculate end-to-end availability availability, thus fairly high availability be. Equipment under consideration have been based on serial and parallel availability calculation formulas )! Availability score, divide the operating time by planned production time the equipment... Cost ( TOC ) of the system or equipment under consideration product, Performance, and Stops... Is able to be operated when desired can be achieved even without redundant components end-to-end.... Handbook is equivalent to Cost of Ownership, availability, you must monitor components... Time ) and Quality true capacity of your manufacturing operation ) x Quality ( 75 ). Formulas and details of the system or equipment under consideration and the Overall equipment Effectiveness was 31.25.! Includes unplanned Stops ( such as changeover time ) saleable, so the Overall equipment Effectiveness was 31.25.! Rate of Quality product, Performance and Quality system is able to be when! 31.25 % to Cost of Ownership various meanings and ways of being computed depending upon its.. Affected by unplanned equipment downtime, material shortages ), and planned Stops ( as. And ways of being computed depending upon its use % ) = 31.25 % of product! And parallel availability calculation formulas equipment availability is 100 per cent, it is available.